Town of Wilmington
121 Glen Road, Wilmington, MA 01887-3597
ph: (978) 658-3311
fx: (978) 658-3334
Installation
If you are looking to install an irrigation or potable drinking water well on your property there are a few steps you need to take.

A plot plan or plan showing your house and septic system is needed.  Mark on the plan with an X where you plan on installing your well.  Some setback distances to remember:

Irrigation Well                                                  Potable drinking well
10 feet from septic tank                                    50 feet from septic tank
25 Feet from leach Field                                  100 feet from leach field

Once you have your permit and the well is installed you will be put on our registered well list.  Please put some sort of sign visible from the street that states you have a well on your property.